Last100Feet

Most Operational Transformations Fail in the Last 100 Feet.

Not because the strategy was wrong or the technology didn’t work. Because the management systems needed to turn leadership intent into consistent daily execution were never built.

Cover of The Execution Gap by Gerald Tice: a cracked concrete wall

New book · Available now

The Execution Gap

Why Manufacturing Transformations Fail in the Last 100 Feet

By Gerald Tice. The diagnosis and the method behind everything on this site, drawn from three decades and more than 600 engagements. Hardcover, paperback and Kindle.

One-minute screen

Execution Maturity Quick Check

Rate each function 1 to 4 from what you see on the floor, not what the procedure says. The lowest-rated function is your constraint, the department where the work starts. The ratings below are examples. Adjust each function to match your operation.

This is a gut-feel screen, not the Execution Maturity Index. The formal EMI scores 16 observable behaviors in each department and produces a structured, behavior-based score.

What is your execution gap costing you?

A rough Opportunity Gap from one loss you can see today: production time lost to the same problems, week after week. Replace the example assumptions with your operating figures.

Who this is for

Plant managers

“How do I make it stick on my floor?”

Start with the Quick Check, then work through the Companion Workbook on your own floor.

Manufacturing executives

“Why don’t our improvements hold?”

Read The Method for the short version, then the book for the five failure points and the blueprint.

PE operating partners

“How do I read execution capability across a portfolio?”

The EMI gives you a department-level baseline before close and an Opportunity Gap you can track after it.

How the pieces fit

Understand

The Execution Gap

The book. Why execution breaks down in the same place every time, and the blueprint for operator-grade execution.

Diagnose and build

Companion Workbook

Free, chapter by chapter. Diagnose the gap on your own floor and start building the system that closes it.

The framework

The Method

What connects them: the EMI to locate the gap, the MOS to close it, and the 25-week architecture to make it hold.